Flooring

  • Application of Epoxy Flooring on Underground Car Park & Lower Ramp at New ERA House
    Product: MasterTop 1200 Primer & MasterTop 1230 Light Grey
    Completed: September 2022

  • Application of UV Resistant Epoxy Flooring on Exterior Parking Deck and Upper Ramp at New ERA House
    Product: MasterTop 1200 Primer & MasterSeal 257 Traffic Grey
    Completed: September 2022

Waterproofing

  • Waterproofing the wet areas at PGS Warehouse in Namanve
    Product: MasterSeal 550KE
    Completed: March 2023

     

  • Waterproofing the roof at Planning House
    Product: MasterSeal 620 Primer & MasterSeal 732 (4mm APP)
    Completed: September 2024

     

  • Waterproofing the roof of an apartment building in Entebbe
    Product: MasterSeal 620 Primer & MasterSeal 732 (4mm APP)
    Completed: October 2024

     

  • Waterproofing the non-potable water tanks at Silver Springs Hotel
    Product: MasterSeal 550KE
    Completed: May 2023

Repair & Bonding

  • Repairing the surface before applying Epoxy Flooring at New ERA House
    Products: MasterEmaco S488, MasterFlow 928 and MasterBrace ADH2200
    Completed: September 2022

     

  • Repairing the surface before applying Epoxy Flooring at Ministry of Finance
    Products: MasterEmaco S488, MasterFlow 928, MasterBrace ADH2200 and Sikadur 31CF
    Completed: January 2025

Joint Sealing

  • Chemical Anchoring at the Aga Khan University Hospital
    Product: MasterFlow 632
    Completed: June 2024

Anchoring

  • Sealing construction and expansion joints at the Coca-Cola Factory
    Product: MasterSeal 474
    Completed: October 2022

Firestops

  • Passive Firestopping at Raxio Data Centre in Namanve
    Product: Phase 1: Hilti expansion foam; Phase 2: Fisher Firestop Boards and Sealants
    Completed: October 2022

  • Passive Firestopping at the Aga Khan University Hospital
    Product: MasterFlame JS110, MasterFlame JS225, MasterFlame B302, MasterFlame PW 2252, MasterFlame MO700
    Completed: February 2025